Thursday, 5 January 2012

I was bored. Then became furious.

I was just browsing the DECC (Department for Energy and Climate change) website for something to do, and came across some interesting statistics. In my view we are spending a fortune on bird mincers.

Of course you see the boast of how many they are building.

Between 2003 and 2010 there was a 143 per cent increase in generation from renewables in the UK, but faster rates of growth were recorded in Northern Ireland (652 per cent), Yorkshire and The Humber (287 per cent), East Midlands (258 per cent), North East (231 per cent) and South East (207 per cent) (see charts 11 and 12). For the individual technology groups some very large increases are recorded in percentage terms because in 2003 there was very little use of some of the technologies in various regions.

Chart 13: Annual variation in load factor1 on an unchanged configuration basis and wind speed

image

The first point I’d like to make is their inefficiency. They seem to be unable to reach their, so called, load rating. As you can see from the graph above, they are incapable of reaching even 30% of the maximum rated load. In the marine industry where I used to work we would never have put up with such. When commissioning generators after overhaul they were expected to deliver 100% power. In fact for a short period they were tested at 110% of full power.

The second point is if you look at the graph again you’ll see how susceptible they are variations in wind speed.

My third point is that nowhere on the website can I find how many turbines are non-operational. (Have a look if you want).

My final point is who pays for the cost of decommissioning?  Below is a small sample taken for offshore turbines

image

image

£40,000 fucking quid per megawatt. Bloody hell. Are they going to take them apart with tweezers? What’s wrong with a few kilos of semtex?

We really are being shafted.

 

1.The ratio of load to the maximum rated load.

6 comments:

  1. "My third point is that nowhere on the website can I find how many turbines are non-operational."

    And just because you see their vanes moving, doesn't necessarily mean they're generating...........

    ReplyDelete
  2. Good comment Joe. When there is no wind they have to be reverse fed from the grid to enable the bearings to be lubricated.
    Do we charge the turbine manufacturers for that/ I doubt it.

    ReplyDelete
  3. So for a 3MW turbine (that produces on average 27% of that or 0.81MW) it costs £120,000 to decommission it?
    For its life of 20 years producing 810kW it takes about 2 months out of that just to pay for it to be decommissioned, or 1% of the power it produces in total. Drax produces 4,000MW, lets say 75% uptime so 3000MW it will have run for 38 years next year, (sorry it was extended in 1986 but I will carry on with the orginal thoughts). I will cost say £1000M to decommission. So that would be 0.001% and thats if we did it now at 38 years, its just been upgraded!!!

    Daedalus

    ReplyDelete
  4. "When there is no wind they have to be reverse fed from the grid to enable the bearings to be lubricated."

    Or in the North Sea by diesel generators. Seen at NoTricksZone

    ReplyDelete
  5. Gravy train for landowners, among others.

    ReplyDelete
  6. "In fact for a short period they were tested at 110% of full power."

    Visions of Scottie from Star Trek. "She's not gonna take it, Captain".

    /flippant

    ReplyDelete

Say what you like. I try to reply. Comments are not moderated. The author of this blog is not liable for any defamatory or illegal comments.